The existing pharmacy at Methodist Specialty Transplant Hospital needed to be outfitted to meet the new compliance requirements including the handling of hazardous drugs, facility and engineering controls, procedures for deactivating, decontaminating and cleaning, spill control, and documentation. The current space had to be reconfigured and altered to meet the new regulations and high demands of healthcare personnel who receive, prepare, administer, transport or otherwise come in contact with hazardous drugs and all the environments in which they are handled for cancer treatment, immunocompromised individuals and transplant patients the MSTH serves.
As General Contractor GRIT Co. successfully provided:
The existing pharmacy at Methodist Specialty Transplant Hospital needed to be outfitted to meet the new compliance requirements including the handling of hazardous drugs, facility and engineering controls, procedures for deactivating, decontaminating and cleaning, spill control, and documentation. The current space had to be reconfigured and altered to meet the new regulations and high demands of healthcare personnel who receive, prepare, administer, transport or otherwise come in contact with hazardous drugs and all the environments in which they are handled for cancer treatment, immunocompromised individuals and transplant patients the MSTH serves.
As General Contractor GRIT Co. successfully provided:
Square Footage
850 SF
Location
San Antonio, Texas
Completion Date
2021
Delivery Method
Design Build
Square Footage
850 SF
Location
San Antonio, Texas
Completion Date
2021
Delivery Method
Design-Build